The Gate Business Technology

Opening at The Gate? Coordinate Every Technology Dependency Before Opening.

Opening a space at The Gate in Frisco? Metro Relay provides local, on-site technology planning and support—from construction through opening day. Based in Richardson, we serve Frisco and North Texas.

Industries · Mixed-Use Development

Technology planning for The Gate.

Get a technology plan guide before opening day is at risk. 25 technology infrastructure items commonly missed during new construction and tenant build-out. Avoid expensive change orders, technology redesigns, construction delays, and infrastructure rework — before your space opens.

Request Plan Review

Early planning · No sales pressure.

What we handle

One team for the whole technology layer.

01

Structured cabling & fiber

Cat6/Cat6A and fiber backbone designed, pulled, terminated, tested, and labeled to enterprise standards.

02

Internet & carrier coordination

We order, schedule, and chase the circuit so your ISP is activated and tested before opening — not after.

03

Networks & commercial Wi-Fi

Business-grade switching, firewall, VLANs, and access points sized for real coverage — front of house to patio.

04

POS connectivity

Reliable wired and wireless connections for point-of-sale, KDS, and payment devices that can’t drop mid-transaction.

05

Security cameras

IP camera cabling, NVR setup, and coverage planning so the space is recording from the day you take possession.

06

Access control

Door readers, controllers, and low-voltage wiring for secure back-of-house, stockrooms, and after-hours entry.

07

Opening-day validation

Every run and connection tested and verified against a punch list before you go live — no day-one surprises.

08

Ongoing IT support

After you open, one local team keeps the network, Wi-Fi, POS, and security running — and scales as you grow.

Why openings slip

What actually delays a tenant opening.

None of these are dramatic. In a phased, multi-building campus like The Gate, they're small coordination gaps that surface the week you're trying to open — when they're most expensive to fix.

Internet circuit not activated in time
Fiber between buildings not coordinated
Wi-Fi drops off past the terrace
POS and payment devices can't connect
Cameras installed but not recording
Vendors blaming one another on opening week
How it works

A clear path from lease to opening.

  1. 01

    Plan

    We review your floor plan, timeline, and vendors, then define exactly what technology goes where.

  2. 02

    Coordinate

    We align the GC, landlord, ISP, POS, and security vendors to one schedule tied to your opening date.

  3. 03

    Install

    Our team pulls, terminates, and installs cabling, networks, Wi-Fi, cameras, and access control.

  4. 04

    Validate

    Every run and device is tested and verified against a punch list before you go live.

  5. 05

    Support

    After opening, one local team keeps it all running and scales it as you grow.

Before you build

Review your floor plan before construction decisions become expensive to change.

FAQ

The Gate technology, answered.

When should we begin technology planning for a space at The Gate?

Begin technology planning as soon as your lease or build-to-suit commitment is signed, ideally before interior construction starts. Early planning lets us confirm internet availability, size the cabling and Wi-Fi, and coordinate with your contractor while walls are still open. In a phased, multi-building development like The Gate, early involvement also helps align pathways between your suite and shared risers or fiber routes.

Does the general contractor handle all technology systems?

Usually not. General contractors typically manage construction, electrical, and sometimes conduit pathways, but structured cabling, fiber, commercial Wi-Fi, networking, POS connectivity, cameras, and access control are specialized low-voltage and IT work. Metro Relay handles those systems directly and coordinates with your GC so pathways, power, and technology terminations line up rather than getting discovered late.

How early should we order business internet for our location?

Order business internet 60 to 90 days before you need it live, and sometimes earlier. Fiber circuits often require construction or provisioning lead time, especially in newer commercial buildings where service may still be built out. Placing the order early protects your opening timeline. Metro Relay can help you scope the circuit and stay ahead of provider lead times.

Can Metro Relay check which internet providers serve our address at The Gate?

Yes. We can research which carriers and circuit types are available at a specific address in Frisco and compare fiber, coax, and fixed-wireless options. Availability in newer developments can differ building by building, so we verify actual serviceability rather than relying on general coverage maps. We then help you weigh speed, contract terms, and installation lead time.

Should we install backup internet?

For most businesses that depend on connectivity, yes. A second circuit or wireless failover keeps point-of-sale, reservations, card processing, and cloud tools running if the primary line goes down. This matters most for restaurants, retail, and hospitality operations at The Gate, where an outage during business hours directly stops revenue. We can design automatic failover so the switch is seamless.

Can Metro Relay review our floor plan before construction begins?

Yes. We review architectural and space plans to mark equipment room locations, cabling pathways, access point placement, camera coverage, and door hardware for access control. Reviewing plans before walls close lets us catch conflicts early and avoid costly rework. This is one of the most valuable steps, and it works best when we are looped in during design rather than after framing.

What information do you need for a technology plan review?

Share your floor plan, the intended use of each area, expected headcount, and any corporate or brand IT standards you must follow. Details like POS locations, hotel room counts, or the number of camera and access-controlled doors help us size the system. If you have a build-to-suit shell drawing for your Gate suite, that lets us map pathways to shared building infrastructure.

Can Metro Relay conduct an on-site walkthrough?

Yes. We walk the space to verify measurements, check ceiling and wall construction, confirm equipment room space, and identify pathway and coverage challenges that drawings do not always show. On-site visits are especially useful in multi-building settings where cabling may route between structures. We serve the Dallas-Fort Worth area, so scheduling a Frisco walkthrough is straightforward.

Does Metro Relay install structured cabling and fiber?

Yes. Structured cabling and fiber are core services. We install category-rated copper for data and Wi-Fi, and fiber for high-bandwidth links and runs between buildings or floors. A campus like The Gate, which markets connectivity across multiple buildings, typically relies on a fiber backbone tying structures together with copper distributing to each work area, camera, and access point.

Does Metro Relay install commercial Wi-Fi?

Yes. We design and install business-grade wireless with proper access point placement, channel planning, and cabling back to the network. Commercial Wi-Fi differs from consumer gear because it must handle many users, roaming, and separate networks for staff and guests. This suits The Gate's marketed Wi-Fi-enabled terraces, tenant lounges, conferencing rooms, and hospitality spaces.

How many wireless access points will our business need?

It depends on square footage, wall construction, user density, and how the space is used, so there is no fixed formula. A dense restaurant or conference area needs more coverage than open office. We determine placement through a design based on your floor plan, and when accuracy matters we can perform a wireless survey to confirm coverage before installation.

Can Metro Relay install the network equipment?

Yes. We install and configure switches, routers, firewalls, and wireless controllers, then connect them to your cabling and internet circuit. We can provide the equipment or work with hardware your corporate IT specifies. The goal is a documented, properly configured network rather than a box of gear left for someone else to sort out later.

Can Metro Relay work with our corporate IT department?

Yes. We regularly act as the local hands and low-voltage partner for companies whose IT is managed at a corporate or national level. We follow your standards for hardware, addressing, and security, handle the physical cabling and installation on-site, and coordinate remote configuration. This is a common arrangement for build-to-suit office tenants bringing established IT requirements to a new location.

Can Metro Relay support a national brand opening its first North Texas location?

Yes. We frequently support brands entering the Dallas-Fort Worth market for the first time. We translate corporate technology standards into the local build, coordinate with regional internet carriers, and manage the on-site work so the opening matches the brand's specifications. For a first Frisco location at The Gate, we bridge the gap between corporate requirements and local execution.

Can Metro Relay receive and stage equipment before installation?

Yes. We can receive, inventory, and stage network gear, POS hardware, cameras, and access control components ahead of installation. Staging lets us pre-configure equipment and confirm everything arrived before crews are on-site, which reduces surprises during a tight opening window. This is helpful when corporate ships hardware directly and the site is not yet secure for storage.

Can Metro Relay coordinate our POS, internet, and technology vendors?

Yes. We regularly coordinate among internet carriers, POS providers, security vendors, and corporate IT so the pieces connect on schedule. One point of coordination prevents the common problem of each vendor waiting on another. For a restaurant or retail space at The Gate, we make sure the network, circuit, and payment systems are ready together rather than in isolation.

Does Metro Relay provide or configure POS systems?

We handle the network side that POS systems depend on, and we coordinate with your POS provider on the rest. That includes cabling to registers and terminals, the wired and wireless network, internet connectivity, and the separation payment systems require. The POS software and merchant account typically come from your chosen vendor, and we make sure the underlying network supports them reliably.

Do restaurants need separate networks for POS and guest Wi-Fi?

Yes. Payment systems should run on a separate, secured network isolated from guest Wi-Fi. Mixing them exposes card data and creates both security and compliance problems. We segment the network so POS traffic is protected while guests get their own access, which is standard practice for the restaurant and hospitality operations planned at The Gate.

Can Metro Relay help with PCI-related network requirements?

Yes, on the network side. We design segmented, firewalled networks that isolate payment systems, a foundational requirement for PCI compliance. We are not a PCI auditor and do not certify compliance, but we build the network so it supports your obligations and coordinate with your POS and payment providers. Formal validation still comes through your qualified assessor or provider.

Can Metro Relay install security cameras?

Yes. We install commercial IP camera systems with cabling, placement for meaningful coverage, recording, and remote viewing. For a mixed-use property with retail, dining, hospitality, and parking areas, camera planning covers entrances, points of sale, back-of-house, and common areas. We size storage and network capacity so footage is retained and accessible when needed.

Can Metro Relay install access control?

Yes. We install electronic access control for doors, including credential readers, controllers, and the cabling and network behind them. Access control suits offices, back-of-house areas, equipment rooms, and residential amenity spaces where you need to manage who enters and keep an audit trail. We coordinate door hardware needs with your contractor so wiring is in place before doors are hung.

When should cameras and access control be planned?

Plan cameras and access control during design, alongside cabling, not after construction. Both need pathways, power, and network drops routed before walls and ceilings close, and access-controlled doors need coordination with the door and electrical trades. Planning early avoids surface-mounted wiring and retrofits. At The Gate, this also lets coverage decisions account for shared entrances and parking areas.

Can Metro Relay help with digital signage, phones, and audiovisual systems?

Yes, primarily through the cabling and network they rely on. We install the drops and connectivity for digital signage, VoIP phones, conference room AV, and displays, and we coordinate with specialty AV integrators when a project needs advanced audiovisual work. For conferencing facilities and tenant lounges like those marketed at The Gate, getting the infrastructure right early keeps later AV installation clean.

Who decides where network and technology equipment should be located?

We recommend equipment room and closet locations based on cable distance limits, power, cooling, and security, then confirm them with you and your contractor. Copper runs have distance limits that drive where gear must sit, so central placement often matters. In a multi-tenant building at The Gate, we also account for shared risers and where your suite connects to building infrastructure.

What should be completed before employee training begins?

Before training, the network, internet, Wi-Fi, POS connectivity, and any camera or access systems should be installed, configured, and tested. Staff should be practicing on systems that work as they will on opening day, not on a half-finished setup. We aim to have technology validated ahead of training so your team learns the real environment rather than a placeholder.

What happens during opening-day technology validation?

We verify every system works under real conditions before you open. That includes confirming internet and failover, testing Wi-Fi coverage, running transactions through POS, checking camera feeds and recording, and confirming access control at each door. Validation catches issues while there is still time to fix them, rather than discovering a dead access point or offline register during your first hours of business.

Can Metro Relay provide on-site support during opening?

Yes. We can have technicians on-site during your opening period to respond immediately to any technology issue. Openings surface problems that only appear under real use, and having someone present means a stuck terminal or connectivity hiccup gets resolved in minutes. This is especially valuable for restaurants and retail at The Gate, where opening days carry heavy transaction volume.

What documentation will we receive after installation?

You receive as-built documentation of the installed systems, including cabling labeling and layout, network configuration details, equipment inventory, and access information for cameras and access control. Good documentation makes future changes, troubleshooting, and support faster, and it matters when corporate IT or a new provider needs to understand the setup. We hand over records rather than leaving systems undocumented.

Can Metro Relay work with vendors we have already selected?

Yes. If you have chosen a POS provider, internet carrier, camera brand, or corporate-standard hardware, we work within those selections. We handle the cabling, network, and integration so your chosen systems function together, and we coordinate schedules and dependencies among them. You are not required to switch vendors to work with us.

Can Metro Relay take over a partially completed technology project?

Yes. We can assess work already done, identify what is usable or needs correction, and complete the remaining installation. This happens when another contractor falls behind, a project stalls, or standards were not followed. We document what we find, then finish to a working, tested state. An honest assessment up front tells you what can be kept and what must be redone.

How much does a business technology buildout cost?

Cost depends on square footage, the number of cabling drops, Wi-Fi coverage, cameras, access-controlled doors, and the network equipment involved, so pricing follows a specific scope rather than a flat figure. A small retail suite and a large office floor differ significantly. We provide a detailed quote after reviewing your plans and needs, so you see exactly what drives the number.

Can Metro Relay support corporate office tenants at The Gate?

Yes. The Gate plans up to roughly a million square feet of Class A/AA office, much of it build-to-suit, and those tenants need structured cabling, fiber, commercial Wi-Fi, networking, conferencing connectivity, cameras, and access control. We build to corporate IT standards, coordinate with the tenant's national IT team, and handle the local installation and testing so the office is ready when construction finishes.

Can Metro Relay support hotel and hospitality technology needs?

Yes. A boutique hotel, like the 200-key property in The Gate's plan, relies on guest Wi-Fi, property networks, POS for food and beverage, cameras, and door access, all of which we install and connect. Hospitality technology must handle high guest density and separate guest and operational traffic. We build the cabling and network foundation these systems depend on and coordinate with the hotel's system providers.

Can Metro Relay support retail and restaurant tenants at The Gate?

Yes. The development plans roughly 50,000 square feet of restaurant and retail space, and those tenants need POS connectivity, segmented networks, guest Wi-Fi, cameras, and often digital signage. We handle the cabling and network so payment systems, back-office tools, and customer Wi-Fi run reliably and securely. We can coordinate the full opening technology scope on the tight timelines retail and dining openings usually require.

Can Metro Relay help connect multiple buildings across the development?

Yes. A campus that markets connectivity across buildings, terraces, and shared amenities typically needs a fiber backbone linking structures, with copper distributing within each. We design and install inter-building fiber, the switching that ties it together, and the wireless coverage for shared outdoor and common spaces. Multi-building connectivity is a core low-voltage discipline, and planning it early keeps pathways and bandwidth consistent across the property.

Can Metro Relay support residential operations at The Gate?

Yes, on the operational and common-area side. Multifamily communities at The Gate need networks for leasing offices, amenity spaces, and fitness and conferencing areas, plus cameras and access control at entrances, parking, and amenity doors. We handle the cabling, network, Wi-Fi for common areas, and security systems that property operations rely on, coordinating with the management team's standards and any resident connectivity provider.

Can Metro Relay support multiple locations?

Yes. We support businesses opening or operating several sites and can standardize cabling, networks, and security across them for consistency. Consistent design makes support, troubleshooting, and future rollouts easier. If you are opening at The Gate as one of several North Texas or national locations, we can align the build with your other sites and coordinate with corporate IT across the portfolio.

What is the first step to get started?

The first step is a conversation about your space, timeline, and what your business needs to operate. From there we review your floor plan, confirm internet availability at your address, and outline the cabling, network, Wi-Fi, and security scope. Reaching out early, ideally once your lease or build-to-suit commitment is in place, gives us the most room to plan and protect your opening date.

Contact

We look forward to chatting with you!

Text us @ 945-945-0777 — a real engineer responds, usually within minutes during business hours.

Call or text us
945-945-0777

A real US-based engineer answers — Available 24×7 for managed clients.

Text now →
Email us
hello@metrorelay.com

For longer questions, proposals, or new project. We respond within one business day, usually faster.

Send an email →
We are local
Dallas–Fort Worth, TX

Serving the Dallas–Fort Worth Metropolitan Area, Texas.

Based in Richardson, we serve Frisco and North Texas too →